Remarks

Main building roof (2019)
Main building water heaters (2019)
Maisonette water heater (2017)
All interior doors of the building (approx. 11 doors in 2016)
The 4 exterior doors of the main building (approx. 2014-2017)
The stringers of all the stairs (2011)
The ramps sanded and painted in several layers.
Paving stone back (2010)
An additional layer of mineral wool in the attic of the house. (approx. 2012)
All electrical complaints and thermostats in the main building and the cottage changed.
New plaster with spit on the south side of the main building (approx. 2010)
Repaired a crack in the concrete of the main building (done by contractor 2013)
Ceramics everywhere, kitchens, steps, entrances...
2 Bathrooms changed in the main building.
Changed several chandeliers on the ceiling to have standard bulbs.
Laminate floors everywhere.
Sand and refinish the parquet (2014)
Installed several recessed with LED bulbs in the basement.

Inclusions:  Fixtures

Listing Agent

Agent

Zhuo Leo Miao

Courtier Immobilier

Email Me


Area Map